Skip to search boxSkip to navigationSkip to main content

Data Analysis and Modelling Plan for Soil Moisture in Lullington Heath & Friston Forest - Pt1

Project status
Finished

About the project

Surface waters face persistent challenges with sediment/turbidity and algae in a range of catchments. Climate change is increasing rainfall intensity and erosion, magnifying sediment and nutrient pulses. <br/><br/>Regulatory drivers such as the Water Industry National Environment Programme (WINEP) require evidence‑based catchment interventions. <br/><br/>Integrated modelling within this project will enable South East Water to target resources where they deliver greatest raw‑water benefit.

Project Information

Project Type

Industry

Project Managed By

Time Period

22/07/2025 – 18/12/2025

Status

Finished