The Application of Six Sigma to Improve the Number of Calls in Ports: Felixstowe Container Port

Student thesis:
Student thesis
Master's Thesis

About the thesis

This dissertation explores strategies to increase the number of ship calls at Felixstowe Port, the UK's largest container port, following a significant decline. Ship calls at Felixstowe have dropped from 2,489 in 2016 to 1,068 in 2024, significantly affecting both revenue and capacity. Compared to major European ports like Rotterdam (14.5 million TEU) and Antwerp (12 million TEU), Felixstowe’s annual throughput of 4 million TEU highlights its diminishing market share, with annual revenue of €296.67 million lagging behind Rotterdam (€770 million) and Antwerp (€650 million).
In light of these challenges, the research aims to analyse the factors contributing to the decline in ship calls and propose strategic solutions to enhance operational efficiency and increase the number of calls. The objectives include assessing the impact of reduced calls, identifying the root causes of inefficiencies, and recommending strategies to address these operational challenges.
Regarding the scope of the study, the research focuses on operational challenges at Felixstowe Port, excluding technical infrastructure issues, with the goal of providing practical recommendations to optimize resource allocation, improve coordination, and reduce delays. The literature review identifies a significant gap in applying Just-In-Time (JIT) and Six Sigma methodologies in port operations, highlighting the potential benefits of these approaches for improving Felixstowe’s operational performance.
To address the identified issues, the research follows the Six Sigma DMAIC framework. In the Define Phase, a project charter was developed to outline the key problem of declining ship calls. In the Measure Phase, secondary data on berth occupancy, container throughput, and ship call numbers was collected to establish baseline performance indicators. The Analyse Phase, using a Five Whys analysis, identified root causes such as congestion, delayed operations, and inefficient coordination.
In response to these findings, the Improve Phase introduced strategies such as dynamic scheduling, improved vessel arrivals, and Kanban systems for cargo tracking, all aimed at reducing waiting times and enhancing resource management. Finally, the Control Phase recommended the use of X-bar and R control charts to monitor and sustain operational improvements over time. The study concludes that operational enhancements can significantly reduce delays and improve coordination, though communication gaps and infrastructure limitations must be addressed to ensure long-term success.