Skip to search boxSkip to navigationSkip to main content

Analyzing the Key Drivers of Contractors’ Temporary Competitive Advantage in the Competition of International High-speed Rail Projects

  • Qianwen Zhou
    ,
  • Xiaopeng Deng
    ,
  • Ruoyu (Roy) Jin
    ,
  • Tengyuan Chang
  • Southeast University, Nanjing
Research output:
Contribution to journal
Article
Research
Peer-review

Open access

About the research

After temporary competitive advantage (TCA) being proposed, this concept has received a lot of attention from academia and industry. For international HSR contractors, how to form their TCA and win out over the competition for new projects is crucial, while only a few studies focus on this issue. This research aims to develop a TCA system that reflects the characteristics of high-speed rail (HSR) contractors in the corporation and project levels. At first, exploratory factor analysis (EFA) and confirmatory factor analysis (CFA) was conducted to explore and examine the key drivers and their relationships with contractors’ TCA. The results revealed that experience-mining advantage was the most critical factor of the six common factors. Next, common factors were divided into three dimensions and discussed in-depth, including resource-based TCA (i.e., technical resource and social image) which had the highest significance, followed by performance-based TCA (experience-mining advantage and risk-controlling performance), and action-based TCA (i.e., funding strategy and organizational management). Finally, two case study projects were selected to investigate the competitive situation between CRH (China Railway High-speed) and Shinkansen (Japan) in the international HSR market. This study not only provides suggestions for contractors to improve their TCA in international HSR projects, but also contributes to the theoretical framework for the TCA theory.

Research output information

Output type

Research output:
Contribution to journal
Article
Research
Peer-review

Original language

English

Pages from-to (Number of pages)

Pages 4579-4591 (13 pages)

Journal (Volume, Issue Number)

KSCE Journal of Civil Engineering (Volume 23, Issue 11)

Publication milestones

  • Accepted/In press - 15/08/2019
  • Published - 04/10/2019

Publication status

Published - 04/10/2019

ISSN

1976-3808