Abstract

Managed Realignment (MR) is becoming increasingly popular with many coastal managers and engineers. Monitoring of MR sites has provided growing evidence that many of the saltmarshes created in these environments have lower biodiversity than naturally formed intertidal marshes, and may not fully deliver the anticipated ecosystem services such as carbon sequestration and coastal flood defence. Despite the importance of the sedimentary environment in developing an intertidal morphology suitable for plant establishment and succession, the evolution of the sediment erosion, transportation, deposition and consolidation cycle in newly breached sites is rarely examined. This study evaluates the hydrodynamics and concentration of suspended sediment exported and imported along the main drainage channel within the Medmerry Managed Realignment Site, West Sussex, UK, the largest open coast realignment in Europe (at the time of breaching). Measurements were taken over a one year period (November 2015 – October 2016) at the breach, at the landwards extremity where freshwater drains into the site, and in an excavated channel in the centre of the site. At the latter site, 1.7 cm of sediment accreted over the study period. Suspended sediment concentration (SSC) measurements indicate that, under ambient conditions, sediment is imported into and exported from the Medmerry site, although similar concentrations of sediment were recorded being internally redistributed around the site (typically 0.11 g/l measured in the breach area compared to 0.12 g/l measured in the centre of the site). Sediment is removed from the site following large (1-2 mm / hour) rainfall events, which take several tidal cycles to drain through the site. Peaks in SSC corresponding with lower intensity rainfall events, especially during periods when the intertidal mudflats have been exposed, have also been observed. Analysis of the hydrodynamics and patterns of sedimentation during and following storm occurrences (the 2015-16 Storms Eva, Imogen and Katie) however demonstrate the relative resilience (i.e. rapid recovery and minimal disturbance) of the site to extreme storm events.
Original languageEnglish
Pages (from-to)100-111
Number of pages12
JournalEstuarine, Coastal and Shelf Science
Volume215
DOIs
Publication statusPublished - 16 Oct 2018

Fingerprint

managed realignment
Drainage
Coastal zones
Sediments
Hydrodynamics
hydrodynamics
Suspended sediments
drainage
coast
suspended sediment
sediment
drain
Rain
Biodiversity
tidal cycle
mudflat
precipitation intensity
Sedimentation
ecosystem service
saltmarsh

Keywords

  • Managed realignment
  • Hydrodynamics
  • Suspended Sediment Concentration
  • Altimeter
  • Storms
  • Medmerry Managed Realignment Site

Cite this

@article{4740420e098642a794eeb1abdfd4349b,
title = "Hydrodynamics and sedimentary processes in the main drainage channel of a large open coast managed realignment site",
abstract = "Managed Realignment (MR) is becoming increasingly popular with many coastal managers and engineers. Monitoring of MR sites has provided growing evidence that many of the saltmarshes created in these environments have lower biodiversity than naturally formed intertidal marshes, and may not fully deliver the anticipated ecosystem services such as carbon sequestration and coastal flood defence. Despite the importance of the sedimentary environment in developing an intertidal morphology suitable for plant establishment and succession, the evolution of the sediment erosion, transportation, deposition and consolidation cycle in newly breached sites is rarely examined. This study evaluates the hydrodynamics and concentration of suspended sediment exported and imported along the main drainage channel within the Medmerry Managed Realignment Site, West Sussex, UK, the largest open coast realignment in Europe (at the time of breaching). Measurements were taken over a one year period (November 2015 – October 2016) at the breach, at the landwards extremity where freshwater drains into the site, and in an excavated channel in the centre of the site. At the latter site, 1.7 cm of sediment accreted over the study period. Suspended sediment concentration (SSC) measurements indicate that, under ambient conditions, sediment is imported into and exported from the Medmerry site, although similar concentrations of sediment were recorded being internally redistributed around the site (typically 0.11 g/l measured in the breach area compared to 0.12 g/l measured in the centre of the site). Sediment is removed from the site following large (1-2 mm / hour) rainfall events, which take several tidal cycles to drain through the site. Peaks in SSC corresponding with lower intensity rainfall events, especially during periods when the intertidal mudflats have been exposed, have also been observed. Analysis of the hydrodynamics and patterns of sedimentation during and following storm occurrences (the 2015-16 Storms Eva, Imogen and Katie) however demonstrate the relative resilience (i.e. rapid recovery and minimal disturbance) of the site to extreme storm events.",
keywords = "Managed realignment, Hydrodynamics, Suspended Sediment Concentration, Altimeter, Storms, Medmerry Managed Realignment Site",
author = "Jonathan Dale and Heidi Burgess and David Nash and Andrew Cundy",
year = "2018",
month = "10",
day = "16",
doi = "10.1016/j.ecss.2018.10.007",
language = "English",
volume = "215",
pages = "100--111",
journal = "Estuarine, Coastal and Shelf Science",
issn = "0272-7714",

}

Hydrodynamics and sedimentary processes in the main drainage channel of a large open coast managed realignment site. / Dale, Jonathan; Burgess, Heidi; Nash, David; Cundy, Andrew.

In: Estuarine, Coastal and Shelf Science, Vol. 215, 16.10.2018, p. 100-111.

Research output: Contribution to journalArticleResearchpeer-review

TY - JOUR

T1 - Hydrodynamics and sedimentary processes in the main drainage channel of a large open coast managed realignment site

AU - Dale, Jonathan

AU - Burgess, Heidi

AU - Nash, David

AU - Cundy, Andrew

PY - 2018/10/16

Y1 - 2018/10/16

N2 - Managed Realignment (MR) is becoming increasingly popular with many coastal managers and engineers. Monitoring of MR sites has provided growing evidence that many of the saltmarshes created in these environments have lower biodiversity than naturally formed intertidal marshes, and may not fully deliver the anticipated ecosystem services such as carbon sequestration and coastal flood defence. Despite the importance of the sedimentary environment in developing an intertidal morphology suitable for plant establishment and succession, the evolution of the sediment erosion, transportation, deposition and consolidation cycle in newly breached sites is rarely examined. This study evaluates the hydrodynamics and concentration of suspended sediment exported and imported along the main drainage channel within the Medmerry Managed Realignment Site, West Sussex, UK, the largest open coast realignment in Europe (at the time of breaching). Measurements were taken over a one year period (November 2015 – October 2016) at the breach, at the landwards extremity where freshwater drains into the site, and in an excavated channel in the centre of the site. At the latter site, 1.7 cm of sediment accreted over the study period. Suspended sediment concentration (SSC) measurements indicate that, under ambient conditions, sediment is imported into and exported from the Medmerry site, although similar concentrations of sediment were recorded being internally redistributed around the site (typically 0.11 g/l measured in the breach area compared to 0.12 g/l measured in the centre of the site). Sediment is removed from the site following large (1-2 mm / hour) rainfall events, which take several tidal cycles to drain through the site. Peaks in SSC corresponding with lower intensity rainfall events, especially during periods when the intertidal mudflats have been exposed, have also been observed. Analysis of the hydrodynamics and patterns of sedimentation during and following storm occurrences (the 2015-16 Storms Eva, Imogen and Katie) however demonstrate the relative resilience (i.e. rapid recovery and minimal disturbance) of the site to extreme storm events.

AB - Managed Realignment (MR) is becoming increasingly popular with many coastal managers and engineers. Monitoring of MR sites has provided growing evidence that many of the saltmarshes created in these environments have lower biodiversity than naturally formed intertidal marshes, and may not fully deliver the anticipated ecosystem services such as carbon sequestration and coastal flood defence. Despite the importance of the sedimentary environment in developing an intertidal morphology suitable for plant establishment and succession, the evolution of the sediment erosion, transportation, deposition and consolidation cycle in newly breached sites is rarely examined. This study evaluates the hydrodynamics and concentration of suspended sediment exported and imported along the main drainage channel within the Medmerry Managed Realignment Site, West Sussex, UK, the largest open coast realignment in Europe (at the time of breaching). Measurements were taken over a one year period (November 2015 – October 2016) at the breach, at the landwards extremity where freshwater drains into the site, and in an excavated channel in the centre of the site. At the latter site, 1.7 cm of sediment accreted over the study period. Suspended sediment concentration (SSC) measurements indicate that, under ambient conditions, sediment is imported into and exported from the Medmerry site, although similar concentrations of sediment were recorded being internally redistributed around the site (typically 0.11 g/l measured in the breach area compared to 0.12 g/l measured in the centre of the site). Sediment is removed from the site following large (1-2 mm / hour) rainfall events, which take several tidal cycles to drain through the site. Peaks in SSC corresponding with lower intensity rainfall events, especially during periods when the intertidal mudflats have been exposed, have also been observed. Analysis of the hydrodynamics and patterns of sedimentation during and following storm occurrences (the 2015-16 Storms Eva, Imogen and Katie) however demonstrate the relative resilience (i.e. rapid recovery and minimal disturbance) of the site to extreme storm events.

KW - Managed realignment

KW - Hydrodynamics

KW - Suspended Sediment Concentration

KW - Altimeter

KW - Storms

KW - Medmerry Managed Realignment Site

U2 - 10.1016/j.ecss.2018.10.007

DO - 10.1016/j.ecss.2018.10.007

M3 - Article

VL - 215

SP - 100

EP - 111

JO - Estuarine, Coastal and Shelf Science

JF - Estuarine, Coastal and Shelf Science

SN - 0272-7714

ER -