If you made any changes in Pure these will be visible here soon.

Research Output 2001 2019

  • 38 Conference contribution with ISSN or ISBN
  • 10 Chapter
  • 10 Article
  • 2 Other contribution
Filter
Conference contribution with ISSN or ISBN
2018

Confirmatory factor analysis of perceived risk factors for crowd safety in large buildings

Alkhadim, M., Gidado, K. & Painting, N., 15 Mar 2018, 8th International Conference on Engineering, Project, and Product Management (EPPM 2017). Cham, Switzerland, p. 1-10 10 p. (Lecture Notes in Mechanical Engineering).

Research output: Chapter in Book/Conference proceeding with ISSN or ISBNConference contribution with ISSN or ISBNResearchpeer-review

Open Access
File
Factor analysis
Stadiums
Risk management
Sports
Disasters
2015

Facilities management for African urban marketplace

Gilchrist, P., Gidado, K. & Abigo, A., 1 Sep 2015, Proceedings of the 6th West Africa Built Environment Research (WABER) Conference. Accra, Ghana, p. 503-516 14 p.

Research output: Chapter in Book/Conference proceeding with ISSN or ISBNConference contribution with ISSN or ISBNResearchpeer-review

Open Access
File
waste management
solid waste
management practice
stakeholder
market

Facilities management for African urban marketplace: attitudinal change to waste as a core strategy

Abigo, A., Gidado, K. & Gilchrist, P., 1 Jan 2015, The 6th international conference on engineering, project, and production management (EPPM2015). Australia, p. 174-184 11 p.

Research output: Chapter in Book/Conference proceeding with ISSN or ISBNConference contribution with ISSN or ISBNResearchpeer-review

Open Access
File
waste management
solid waste
management practice
stakeholder
market

How Nigerian PPP Affordable Housing projects can be better implemented Using Institutional Analysis Development Framework

Ojebode, J., Gidado, K. & Painting, N., 10 Sep 2015, Proceedings of 6th international conference on engineering, project, and production management (EPPM2015). Gold Coast, Australia, p. 29-36 8 p.

Research output: Chapter in Book/Conference proceeding with ISSN or ISBNConference contribution with ISSN or ISBNResearchpeer-review

public private partnership
housing
Nigeria
life cycle
twenty-first century

Integrating highway engineering and transformation project management

Liassides, M. C., Eslimy-Isfahany, S. & Gidado, K., 4 Sep 2015, The 6th international conference on engineering, project, and production management (EPPM2015). Australia, p. 495-507 13 p.

Research output: Chapter in Book/Conference proceeding with ISSN or ISBNConference contribution with ISSN or ISBNResearchpeer-review

Open Access
File
Project management
Structured interview
Guidance
Literature review
Managing change
2014

Delays to mechanical services-type projects associated with national culture in Saudi Arabia

Alkharnamy, A., Gidado, K. & Painting, N., 26 Nov 2014, International conference on engineering, project, and production management conference proceedings. Port Elizabeth, South Africa, p. 144-153 10 p.

Research output: Chapter in Book/Conference proceeding with ISSN or ISBNConference contribution with ISSN or ISBNResearchpeer-review

Costs
Uncertainty

Facilities Management: physical built environmental factors that influence user performance in an office building

Sindhu, A. J. & Gidado, K., 26 Nov 2014, 5th international conference on engineering, project and production management. South Africa, p. 2-9 8 p.

Research output: Chapter in Book/Conference proceeding with ISSN or ISBNConference contribution with ISSN or ISBNResearchpeer-review

Office buildings
Industry
Managers
Productivity

Provision of affordable housing in Nigeria: Successes so far & future challenges

Ojebode, J., Gidado, K. & Painting, N., 16 Dec 2014, 40th IAHS world congress on housing: sustainable housing construction. Funchal, Portugal, p. 0-0 1 p.

Research output: Chapter in Book/Conference proceeding with ISSN or ISBNConference contribution with ISSN or ISBNResearchpeer-review

affordable housing
housing project
public-private partnership
research method
twenty first century
2013

The development of decision evaluation model (DEM) to determine between manufacturing off-site or on-site methods for the construction of house building projects

Elnaas, H., Gidado, K. & Ashton, P., 23 Oct 2013, Proceedings of the 4th international conference on engineering, project, and production management. Bangkok, Thailand, p. 75-86 12 p.

Research output: Chapter in Book/Conference proceeding with ISSN or ISBNConference contribution with ISSN or ISBNResearchpeer-review

Open Access
File
Manufacturing
Evaluation model
Factors
Decision strategy
Evaluation
2012

Causes of project delay in the construction industry in Afghanistan

Gidado, K. & Niazai, G., 10 Sep 2012, EPPM2012. Brighton, UK, p. 63-74 12 p.

Research output: Chapter in Book/Conference proceeding with ISSN or ISBNConference contribution with ISSN or ISBNResearchpeer-review

File
Construction industry
Contractors

Embedding sustainable facilities management in the management of public buildings in Nigeria

Abigo, A., Madgwick, D., Gidado, K. & Okonji, S., 1 Jan 2012, EPPM 2012. Brighton, UK, p. 369-380 12 p.

Research output: Chapter in Book/Conference proceeding with ISSN or ISBNConference contribution with ISSN or ISBNResearchpeer-review

File
Personnel
Carbon
Sustainable development

Evaluation of factors affecting productivity in the UAE construction industry

Gidado, K. & Ailabouni, N., 10 Sep 2012, EPPM 2012. Brighton, UK, p. 131-142 12 p.

Research output: Chapter in Book/Conference proceeding with ISSN or ISBNConference contribution with ISSN or ISBNResearchpeer-review

File
Construction industry
Productivity
Plaster
Excavation
Linear regression

Factors and drivers effecting the decision of using off-site manufacturing (OSM) in house building industry

Gidado, K., Elnaas, H. & Ashton, P., 10 Sep 2012, EPPM2012. Brighton, UK, p. 207-216 10 p.

Research output: Chapter in Book/Conference proceeding with ISSN or ISBNConference contribution with ISSN or ISBNResearchpeer-review

File
Industry
Decision making

Factors influencing construction productivity in Afghanistan

Gidado, K. & Karimi, S., 10 Sep 2012, EPPM 2012. Brighton, UK, p. 143-154 12 p.

Research output: Chapter in Book/Conference proceeding with ISSN or ISBNConference contribution with ISSN or ISBNResearchpeer-review

File
Influencing factors
Afghanistan
Productivity
Crime
Corruption

Improvement in construction planning effort by small and medium enterprises (SME) in the UK over the last 12 years

Gidado, K. & Ebrahimi, M., 10 Sep 2012, EPPM2012. Brighton, UK, p. 177-184 8 p.

Research output: Chapter in Book/Conference proceeding with ISSN or ISBNConference contribution with ISSN or ISBNResearchpeer-review

File
Planning
Industry
Construction industry
Costs

Novel designs of Tin-Glass for structural and finishing materials

Bugas, V., Diakoumi, M., Gidado, K., Manzanares, M. & Sazhina, E., 10 Sep 2012, Proceedings of the 3rd international conference on engineering, project and production management EPPM2012. Brighton, UK, p. 263-274 12 p.

Research output: Chapter in Book/Conference proceeding with ISSN or ISBNConference contribution with ISSN or ISBNResearchpeer-review

Open Access
File
Tin
Glass
Concretes
Composite materials
Silica

Potential of using EAHX for low energy cooling in Nigeria

Gidado, K. & Ojebode, J., 10 Sep 2012, EPPM2012. Brighton, UK, p. 347-354 8 p.

Research output: Chapter in Book/Conference proceeding with ISSN or ISBNConference contribution with ISSN or ISBNResearchpeer-review

File
Heat exchangers
Earth (planet)
Cooling
Air
Tubes (components)
2011

The maximisation of the use of reclaimed asphalt pavement (RAP) in the Greek construction industry

Marantzidis, I. & Gidado, K., 2011, Proceedings of 27th Annual Conference of the Association of Researchers in Construction Management. University of Western England (UWE), Bristol, UK, p. 1125-1134 10 p.

Research output: Chapter in Book/Conference proceeding with ISSN or ISBNConference contribution with ISSN or ISBNResearchpeer-review

Open Access
File

The problem of non-completion of infrastructure projects

Oppong-Danquah, A., Painting, N., Adeyeye, O. & Gidado, K., 2011, Proceedings at the West African Built Environment Research Conference. p. 919-927 9 p.

Research output: Chapter in Book/Conference proceeding with ISSN or ISBNConference contribution with ISSN or ISBNResearchpeer-review

2010

A model for Private Finance Initiative implementation in Sub-Saharan Africa - Nigeria as a case study

Gidado, K., 1 Jan 2010, Proceedings of the Third International World of Construction project management conference. Coventry University Technical Park, p. 110-120 11 p.

Research output: Chapter in Book/Conference proceeding with ISSN or ISBNConference contribution with ISSN or ISBNResearchpeer-review

2009

Simulated performance of Earthtubes for cooling of office buildings in the Southeast of UK

Ahmed, A., Ip, K., Miller, A. & Gidado, K., May 2009, 1st International Conference on Sustainability in Energy and Buildings.

Research output: Chapter in Book/Conference proceeding with ISSN or ISBNConference contribution with ISSN or ISBNResearchpeer-review

Thermal performance of earth-air heat exchanger for reducing cooling demand of office buildings in the United Kingdom

Ahmed, A., Ip, K., Miller, A. & Gidado, K., 2009, International Building Performance Simulation Association conference (IBSPA).

Research output: Chapter in Book/Conference proceeding with ISSN or ISBNConference contribution with ISSN or ISBNResearchpeer-review

2008

Evaluating the potential of renewable energy technologies for buildings in Nigeria

Ahmed, A. & Gidado, K., 2008, Association of Researchers for Construction Management (ARCOM).

Research output: Chapter in Book/Conference proceeding with ISSN or ISBNConference contribution with ISSN or ISBNResearchpeer-review

PFI hospitals in the UK: measuring the medical practitioners level of satisfaction

Edet, C. & Gidado, K., 2008, Proceedings of 24th Annual Conference of the Association of Researchers in Construction Management. Cardiff, Wales, UK, p. 527-534 8 p.

Research output: Chapter in Book/Conference proceeding with ISSN or ISBNConference contribution with ISSN or ISBNResearchpeer-review

Open Access
File

The use of earth-air heat exchanger for improving comfort conditions for buildings in tropical climate

Ahmed, A. & Gidado, K., 2008, RICS Construction, Building and Real Estate Research Conference, COBRA 2008.

Research output: Chapter in Book/Conference proceeding with ISSN or ISBNConference contribution with ISSN or ISBNResearchpeer-review

2007

Factors affecting employee productivity in the UAE construction industry

Ailabouni, N., Gidado, K. & Painting, N., Nov 2007, Conference for Postgraduate Researchers of the Built and Natural Environment (PRoBE).

Research output: Chapter in Book/Conference proceeding with ISSN or ISBNConference contribution with ISSN or ISBNResearchpeer-review

2004

Development of a model for the implementation of PFI/PPP in Cyprus

Gidado, K. & Smilas, M., 2004, Proceedings of the 20th annual ARCOM conference. Khosrowshahi, F. (ed.). Reading, UK, Vol. 1. p. 693-702 10 p.

Research output: Chapter in Book/Conference proceeding with ISSN or ISBNConference contribution with ISSN or ISBNResearchpeer-review

Open Access
File

PPP/PFI project evaluation model for Nigeria

Gidado, K., Jun 2004, Building Capacity in Programmes Management. The Nigerian Economic Summit Group. International Conference on PPP and Infrastructure Development in Nigeria.

Research output: Chapter in Book/Conference proceeding with ISSN or ISBNConference contribution with ISSN or ISBNResearchpeer-review

Suitability of different design and build configurations for procurement of buildings

Gidado, K. & Arshi, S., Sep 2004, The International Construction Conference, Royal Institute for Chartered Surveyors RICS COBRA 2004.

Research output: Chapter in Book/Conference proceeding with ISSN or ISBNConference contribution with ISSN or ISBNResearchpeer-review

The constraints affecting the implementation of PFI/PPP in Cyprus

Gidado, K. & Smilas, M., Jul 2004, Proceedings of the 1st International Conference on Commercial Management.

Research output: Chapter in Book/Conference proceeding with ISSN or ISBNConference contribution with ISSN or ISBNResearchpeer-review

The funding, risks and constraints affecting the implementation of PFI/PFP in Poland

Gidado, K., Painting, N. & Sobotka, A., 2004, 50th Annual Construction Conference.

Research output: Chapter in Book/Conference proceeding with ISSN or ISBNConference contribution with ISSN or ISBNResearchpeer-review

Open Access
File

Value for money and facilities performances: a systems approach

Gidado, K. & Rutter, D. K., 2004, Proceedings of 20th Annual Conference for the Association of Researchers in Construction Management. p. 287-298 12 p.

Research output: Chapter in Book/Conference proceeding with ISSN or ISBNConference contribution with ISSN or ISBNResearchpeer-review

Open Access
File
2003

The risks and constraints in the implementation of PFI/PPP in Nigeria

Akelere, D. & Gidado, K., 2003, Proceedings of the 19th annual ARCOM conference. Greenwood, D. (ed.). Reading, Vol. 1. p. 379-392 14 p.

Research output: Chapter in Book/Conference proceeding with ISSN or ISBNConference contribution with ISSN or ISBNResearchpeer-review

Open Access
File
2002

Decision making associated with inadequate site investigation procedures relative to project complexity

Gidado, K., Nov 2002, Proceedings of the International Conference of Decision Making in Urban and Civil Engineering.

Research output: Chapter in Book/Conference proceeding with ISSN or ISBNConference contribution with ISSN or ISBNResearchpeer-review

The current state of use of electronic document management systems by UK architectural practices

Gidado, K. & Nicholls, M., Nov 2002, Proceedings of the International Conference of Decision Making in Urban and Civil Engineering.

Research output: Chapter in Book/Conference proceeding with ISSN or ISBNConference contribution with ISSN or ISBNResearchpeer-review

The identification of uncertainty and risk associated with inadequate site investigation procedures under design and built procurement systems

Gidado, K., Sep 2002, Proceedings of the Association of Researchers in Construction Management 18th Annual ARCOM conference.

Research output: Chapter in Book/Conference proceeding with ISSN or ISBNConference contribution with ISSN or ISBNResearchpeer-review

2001

A site investigation procedural framework model designed to reduce uncertainty associated with site and ground conditions

Gidado, K., Sep 2001, COBRA 2001. Proceedings of the RICS Foundation Construction and Building Research Conference.

Research output: Chapter in Book/Conference proceeding with ISSN or ISBNConference contribution with ISSN or ISBNResearchpeer-review

Risk associated with inadequate site investigation procedures under design and build procurement systems

Gidado, K., Sep 2001, Proceedings of Association of Researchers in Construction Management (ARCOM) conference.

Research output: Chapter in Book/Conference proceeding with ISSN or ISBNConference contribution with ISSN or ISBNResearchpeer-review